Laser Beam Splitter Glass: R/T 50/50, 30/70, 10/90 at 45 degrees. Single-piece prototypes to production volumes, quoted from your drawing.
We supply laser beam splitter glass to R/T 50/50, 30/70, 10/90 at 45 degrees – and because we are a machining house first, non-standard outlines, notches and mounting holes are part of the normal order, not an exception.
The numbers
| Optical specification | R/T 50/50, 30/70, 10/90 at 45 degrees |
|---|---|
| RFQ inputs | PDF/DXF/STEP drawing, quantity brackets, surface and edge spec |
DFM notes from the shop floor
Before sending the RFQ, check these against your drawing:
- Over-specification is the quiet budget killer: a 20/10 scratch-dig face costs roughly three times an 80/50 face, so grade each surface individually.
The full rules live in our tolerance design guide and holes and edges design guide.
Where these parts end up
laser beam splitter glass shows up across ccd inspection equipment (CCD cover plates, reference grids, stage glass); microfluidic devices (chips, manifolds, via plates, bonded stacks); machine vision (camera windows, ring-light diffusers, calibration plates).
Dimensions still moving? Configure this part live in the 3D + 2D builder below, or open the full custom glass machining 3D + 2D builder to start from a blank canvas.
Useful companion pages: laser glass cutting, beam splitter glass, glass wafer coring.
Buyer questions, answered
What files do you need for a quote?
A dimensioned PDF plus DXF or STEP geometry. If only a sketch exists, our drawing review service formalizes it before quoting.
Do parts ship with inspection data?
Dimensional reports, surface certificates and material certs per melt are available; specify the level on the RFQ.
Is there a minimum order for laser beam splitter glass?
No. Single prototypes are accepted, and pricing steps down at 10, 100 and 1,000 pieces.
How fast can prototypes ship?
Machined prototypes ship in 5 – 10 working days. Coated or bonded parts add 1 – 2 weeks depending on queue slots.
Specifications on this page were last reviewed by our engineering team in August 2026.