Precision Glass Thickness Control – thickness +/-0.003 mm via lapping and DSP. No minimum order; DFM review included with every RFQ.
Drawings fail at the tolerance block more than anywhere else. For precision glass thickness control the achievable envelope is thickness +/-0.003 mm via lapping and DSP – the method is double-side processing with gauging.
The numbers
| Held tolerance | thickness +/-0.003 mm via lapping and DSP |
|---|---|
| Method | double-side processing with gauging |
| Reference standard | SEMI wafer thickness grades |
| RFQ inputs | PDF/DXF/STEP drawing, quantity brackets, surface and edge spec |
Getting the drawing right
The shop-floor rules that matter here:
- Cite SEMI wafer thickness grades on the drawing so both sides measure the same way.
- Over-specification is the quiet budget killer: a 20/10 scratch-dig face costs roughly three times an 80/50 face, so grade each surface individually.
For the complete framework, see the tolerance design guide and the holes and edges design guide.
Who orders this
The recurring buyers of precision glass thickness control: microfluidic devices (chips, manifolds, via plates, bonded stacks); oled packaging (cover lids, frit-seal frames, fill-port plates); medical diagnostics (flow cells, slides, microplate bottoms, cuvette windows).
If the part is easier to draw than describe, the custom glass machining 3D + 2D builder turns dimensions into an RFQ in a few minutes.
For adjacent specifications, see precision glass grinding, high-purity quartz guide, glass in laser systems.
Common questions
Do parts ship with inspection data?
Dimensional reports, surface certificates and material certs per melt are available; specify the level on the RFQ.
Which standard governs this?
SEMI wafer thickness grades, verified by double-side processing with gauging.
Is there a minimum order for precision glass thickness control?
No. Single prototypes are accepted, and pricing steps down at 10, 100 and 1,000 pieces.
How fast can prototypes ship?
Machined prototypes ship in 5 – 10 working days. Coated or bonded parts add 1 – 2 weeks depending on queue slots.
Specifications on this page were last reviewed by our engineering team in September 2026.