Hole Position Tolerance in Glass

Hole Position Tolerance in Glass: true position +/-0.02 mm across 300 mm. No MOQ, prototypes in 5-10 days, DFM review with every RFQ.

Technical Guide July 30, 2026 Updated August 29, 2026

Hole Position Tolerance in Glass: true position +/-0.02 mm across 300 mm. Single-piece prototypes to production volumes, quoted from your drawing.

Drawings fail at the tolerance block more than anywhere else. For hole position tolerance in glass the achievable envelope is true position +/-0.02 mm across 300 mm – the method is vision-registered drilling.

The numbers

Held tolerance true position +/-0.02 mm across 300 mm
Method vision-registered drilling
Reference standard ISO 2768 + drawing GD&T
RFQ inputs PDF/DXF/STEP drawing, quantity brackets, surface and edge spec

Specification advice

Before sending the RFQ, check these against your drawing:

  • Cite ISO 2768 + drawing GD&T on the drawing so both sides measure the same way.
  • Over-specification is the quiet budget killer: a 20/10 scratch-dig face costs roughly three times an 80/50 face, so grade each surface individually.

For the complete framework, see the tolerance design guide and the holes and edges design guide.

Who orders this

hole position tolerance in glass shows up across ccd inspection equipment (CCD cover plates, reference grids, stage glass); oled packaging (cover lids, frit-seal frames, fill-port plates); laser systems (windows, beam splitters, debris shields).

If the part is easier to draw than describe, the custom glass machining 3D + 2D builder turns dimensions into an RFQ in a few minutes.

For adjacent specifications, see high-purity quartz guide, CNC machining capability, glass wafer bonding.

Buyer questions, answered

How fast can prototypes ship?

Machined prototypes ship in 5 – 10 working days. Coated or bonded parts add 1 – 2 weeks depending on queue slots.

What files do you need for a quote?

A dimensioned PDF plus DXF or STEP geometry. If only a sketch exists, our drawing review service formalizes it before quoting.

Do parts ship with inspection data?

Dimensional reports, surface certificates and material certs per melt are available; specify the level on the RFQ.

Which standard governs this?

ISO 2768 + drawing GD&T, verified by vision-registered drilling.

Specifications on this page were last reviewed by our engineering team in August 2026.

Engineering Review

Questions your drawing cannot answer?

Send it over - our drawing review flags the gaps before they cost money.