Microfluidic Chip Prototyping: 3 – 5 chips per iteration, DFM feedback each round. Single-piece prototypes to production volumes, quoted from your drawing.
microfluidic chip prototyping: design iterations in days, not months. Capability: 3 – 5 chips per iteration, DFM feedback each round.
The numbers
| Microfluidic capability | 3 – 5 chips per iteration, DFM feedback each round |
|---|---|
| RFQ inputs | PDF/DXF/STEP drawing, quantity brackets, surface and edge spec |
Specification advice
Three items decide most of the cost and lead time on this work:
- Channel cross-sections are process-specific: etched channels are lens-shaped, machined ones rectangular with corner radii. State which your CFD model assumed.
- Over-specification is the quiet budget killer: a 20/10 scratch-dig face costs roughly three times an 80/50 face, so grade each surface individually.
For the complete framework, see the tolerance design guide and the holes and edges design guide.
Where these parts end up
microfluidic chip prototyping shows up across laboratory instruments (cuvettes, sight glasses, stir-cell windows); microfluidic devices (chips, manifolds, via plates, bonded stacks); scientific instruments (reference flats, cells, prism mounts, stage inserts).
Dimensions still moving? Configure this part live in the 3D + 2D builder below, or open the full custom glass machining 3D + 2D builder to start from a blank canvas.
Useful companion pages: special-shaped glass plates, alkali-free glass wafers, Borofloat 33 selection guide.
Frequently asked questions
What files do you need for a quote?
A dimensioned PDF plus DXF or STEP geometry. If only a sketch exists, our drawing review service formalizes it before quoting.
Do parts ship with inspection data?
Dimensional reports, surface certificates and material certs per melt are available; specify the level on the RFQ.
Is there a minimum order for microfluidic chip prototyping?
No. Single prototypes are accepted, and pricing steps down at 10, 100 and 1,000 pieces.
How fast can prototypes ship?
Machined prototypes ship in 5 – 10 working days. Coated or bonded parts add 1 – 2 weeks depending on queue slots.
Specifications on this page were last reviewed by our engineering team in October 2026.