Infrared Optical Windows: fused silica to 2.5 um, sapphire referrals beyond. Single-piece prototypes to production volumes, quoted from your drawing.
infrared optical windows do one job: protect thermal sensors without signal loss. Ours are built to fused silica to 2.5 um, sapphire referrals beyond and cut, edged and mounted to whatever outline the housing needs.
Key parameters
| Optical specification | fused silica to 2.5 um, sapphire referrals beyond |
|---|---|
| RFQ inputs | PDF/DXF/STEP drawing, quantity brackets, surface and edge spec |
Getting the drawing right
The shop-floor rules that matter here:
- Over-specification is the quiet budget killer: a 20/10 scratch-dig face costs roughly three times an 80/50 face, so grade each surface individually.
For the complete framework, see the tolerance design guide and the holes and edges design guide.
Who orders this
The recurring buyers of infrared optical windows: led packaging (groove covers, phosphor carriers, package windows); aerospace optics (sensor windows, star-tracker flats, radiation-tolerant ports); mems devices (cap wafers, TGV substrates, motion-sensor lids).
Dimensions still moving? Configure this part live in the 3D + 2D builder below, or open the full custom glass machining 3D + 2D builder to start from a blank canvas.
For adjacent specifications, see infrared windows, Borofloat 33 selection guide, CNC machining capability.
Frequently asked questions
What files do you need for a quote?
A dimensioned PDF plus DXF or STEP geometry. If only a sketch exists, our drawing review service formalizes it before quoting.
Do parts ship with inspection data?
Dimensional reports, surface certificates and material certs per melt are available; specify the level on the RFQ.
Is there a minimum order for infrared optical windows?
No. Single prototypes are accepted, and pricing steps down at 10, 100 and 1,000 pieces.
How fast can prototypes ship?
Machined prototypes ship in 5 – 10 working days. Coated or bonded parts add 1 – 2 weeks depending on queue slots.
Specifications on this page were last reviewed by our engineering team in October 2026.